Mount Avernia, Singapore - Off Site Engineering
Project
The concept of this project is to build two
complete operating theatres in a modular containerized unit. These set of
containers will then sit on a pre-fabricated concrete platform built on the 4th
floor of the hospital. The platform is built parallel to the existing operating
theatres. An opening will be made to the clean and dirty corridor.
The whole story started way back in August 2005
when we nominated to carry out the Operating theatre expansion plan. We have
been bidding for this job since 2004. We were chosen simply because the idea we
had proposed was unique in this part of the world and the biggest problem we
solved was time to construct and complete.
By building the platform and the containerized operating theatre
simultaneously at two separate locations, we were able to dramatically reduced
the construction period, not to mention reducing the obstruction caused by
general construction work at site. As we all know, “downtime” is a major issue
in the hospital industry.